Brexit preparations

In preparation for a Hard Brexit, EWMS have made preparations and modifications to the existing Clinical Waste Incineration plant and Crematorium setup, with a view of maximizing local destruction throughput of infectious/biohazardous wastes and thereby minimising the need to depend on exports to EU Authorized Plants of any backlogs or excesses collected. As a result […]

Read More